ROADWAY IMPROVEMENTS

RECONSTRUCTION

SR 90 SW 8th Street from West of SW 74 Court to West of SW 57th Avenue
Calle8 313.JPG

2020 

-

Present

Client: FDOT District 6

Financial Project ID: 443919-1-32-01

 

Project Scope: Resurfacing, Restoration, and Rehabilitation 

REI Responsibilities: Ribbeck Engineering was the prime consultant for the SR 90 SW 8th Street. The REI responsibilities include the milling and resurfacing, sidewalk reconstruction, and upgrades to ADA features, signing and pavement markings, signalization improvements, and lighting. 

SR 5 / US-1 from SW 184th Street to SW 168th Street – RRR Improvements
sr 5us-1 RRR.jpg

2017 

-

2019

Client: FDOT District 6

 

Financial Project ID: 428487-2-52-01

 

Project Scope: RRR Improvements

REI Responsibilities: Ribbeck Engineering was responsible for the design and contract document detailing the RRR improvements of 1.028 miles of roadway improvements including) incidental drainage, signing and pavement markings, and 3 signalized intersections

SR 7/US 441 From NW 2 Avenue to Turnpike Connector Bridge

2016

-

2018

Client: FDOT District 6

 

Financial Project ID: 425637-2-52-01

 

Project Scope: RRR Improvements 

REI Responsibilities: Ribbeck Engineering was responsible for the design and plans production of the RRR improvements along SR 7/US 441 Ramp within the Golden Glades Interchange, including roadway plans, traffic control plans Level 2, and Signing and Pavement Markings plans. 

 

SR 9/ NW 27 Avenue from 39 Street to NW 79 Street

Concrete Wall

2016

-

2018

Client: FDOT District 6

 

Financial Project ID: 429185-2-52-01

 

Project Scope: RRR Improvements 

REI Responsibilities: Ribbeck Engineering was responsible for the design and plans production of the roadway component of the RRR improvements of 2.5 miles of roadway improvements including incidental drainage, partial roadway reconstruction, signing and pavement markings, and 10 signalized intersections. 

SR-25/Okeechobee Road at West 16th Avenue/West 29th Street

Concrete Wall

2016

-

2018

Client: FDOT District 6

 

Financial Project ID: 437917-1-52-01

 

Project Scope: Roadway Safety Improvements

REI Responsibilities: Ribbeck Engineering was responsible for the design and contract document detailing the safety improvements of 0.3 miles of roadway improvements including roadway widening for left turn lane, milling and resurfacing, TCP level 3, signing and pavement markings, and signalization upgrades.  

SR-90/US 41 Tamiami Trail from MP 13.131 to MP 13.868

Concrete Wall

2014

-

2016

Client: FDOT District 6

 

Financial Project ID: 405636-2-52-01

 

Project Scope: RRR Improvements

REI Responsibilities:  Ribbeck Engineering was responsible for the design and contract document detailing the RRR improvements of 0.737 miles of roadway improvements. 