RIBBECK
ENGINEERING, INC.
ROADWAY IMPROVEMENTS
RECONSTRUCTION
SR 90 SW 8th Street from West of SW 74 Court to West of SW 57th Avenue
2020
-
Present
Client: FDOT District 6
Financial Project ID: 443919-1-32-01
Project Scope: Resurfacing, Restoration, and Rehabilitation
REI Responsibilities: Ribbeck Engineering was the prime consultant for the SR 90 SW 8th Street. The REI responsibilities include the milling and resurfacing, sidewalk reconstruction, and upgrades to ADA features, signing and pavement markings, signalization improvements, and lighting.
SR 5 / US-1 from SW 184th Street to SW 168th Street – RRR Improvements
2017
-
2019
Client: FDOT District 6
Financial Project ID: 428487-2-52-01
Project Scope: RRR Improvements
REI Responsibilities: Ribbeck Engineering was responsible for the design and contract document detailing the RRR improvements of 1.028 miles of roadway improvements including) incidental drainage, signing and pavement markings, and 3 signalized intersections
SR 7/US 441 From NW 2 Avenue to Turnpike Connector Bridge
2016
-
2018
Client: FDOT District 6
Financial Project ID: 425637-2-52-01
Project Scope: RRR Improvements
REI Responsibilities: Ribbeck Engineering was responsible for the design and plans production of the RRR improvements along SR 7/US 441 Ramp within the Golden Glades Interchange, including roadway plans, traffic control plans Level 2, and Signing and Pavement Markings plans.
SR 9/ NW 27 Avenue from 39 Street to NW 79 Street
2016
-
2018
Client: FDOT District 6
Financial Project ID: 429185-2-52-01
Project Scope: RRR Improvements
REI Responsibilities: Ribbeck Engineering was responsible for the design and plans production of the roadway component of the RRR improvements of 2.5 miles of roadway improvements including incidental drainage, partial roadway reconstruction, signing and pavement markings, and 10 signalized intersections.
SR-25/Okeechobee Road at West 16th Avenue/West 29th Street
2016
-
2018
Client: FDOT District 6
Financial Project ID: 437917-1-52-01
Project Scope: Roadway Safety Improvements
REI Responsibilities: Ribbeck Engineering was responsible for the design and contract document detailing the safety improvements of 0.3 miles of roadway improvements including roadway widening for left turn lane, milling and resurfacing, TCP level 3, signing and pavement markings, and signalization upgrades.
SR-90/US 41 Tamiami Trail from MP 13.131 to MP 13.868
2014
-
2016
Client: FDOT District 6
Financial Project ID: 405636-2-52-01
Project Scope: RRR Improvements
REI Responsibilities: Ribbeck Engineering was responsible for the design and contract document detailing the RRR improvements of 0.737 miles of roadway improvements.