Indian Creek Drive from 26 Street to 41 Street Reconstruction - Sea Level Rise Mitigation Project
2017
-
2019
Client: City of Miami Beach
Financial Project ID: 439228-2-58-01
Project Description: SR A1A/Indian Creek Drive From 25th Street to 41st Street
Scope of Work: Correct/ Prevent damages from Sea Level Rise Flood Mitigation
REI Responsibilities: Roadway Reconstruction of over 0.9 miles of roadway along with SR A1A/ Indian Creek Drive (raised road 3-ft), the addition of a new 60,000 GPM Pump Station, New Drainage System with a 5200-LF 72-in trunk line, Seawall Replacement, New Signalization, and New Lighting. Harmonization of over 60 adjacent properties and 3 new signalized intersections, development of a Request for Proposal package with conceptual plans and design criteria as part of Phase I of this project.
SR-9/NW 27th Avenue from South of SR 934/ NW 74th Street to North of SR 932/ NW 103rd Street
2017
-
2019
Client: Miami Dade Expressway
Financial Project ID: 429185-3-52-01
Project Description: SR 9/ NW 27th Avenue Drainage Reconstruction Project
Scope of Work: 2.2 miles of drainage improvements, Roadway Reconstruction, ADA Upgrades, Signal Improvements, Signing & Pavement Markings Improvement
REI Responsibilities: Ribbeck Engineering, Inc. provided engineering design services as a prime consultant for the Drainage Improvements at 23 locations along NW 27th Avenue. Ribbeck handled the design and plans production for the improvements of 2.3 miles including partial roadway reconstruction, signing and pavement markings, and 4 signalized intersections
SR-925/NW 3rd Court & NW 3rd Avenue from NW 1st Street to NW 8th Street + I-95 Connection Ramps
2017
-
2019
Client: Miami Dade Expressway
Financial Project ID: 429300-4-52-01
Project Description: SR 925/ NW 3rd Court & NW 3rd Avenue from NW 1st Street to NW 8th Street RRR improvements project.
Scope of Work: Roadway improvements included incidental drainage, partial roadway reconstruction, signing and pavement markings, and 12 signalized intersections.
REI Responsibilities: Ribbeck Engineering, was the prime consultant and managed staff and sub-consultants to ensure cost-efficient and timely improvements, as well as, designing and executing services originally identified, plans production, design, and contract document detailing for the RRR improvements of 1.3 miles along NW 1st Street.
FDOT D6 SR 907/Alton Road from 43 Street to Allison Road
2015
-
Pres.
Client: City of Miami Beach
Financial Project ID: 430444
Project Description: SR 915/ 6th Avenue NE 113 Street Sidewalk and Drainage Improvements
Scope of Work: Address drainage needs for both local roads and the State Roadway Facility (LaGorce Island)
REI Responsibilities: Ribbeck Engineering, Inc. were the drainage engineers on record responsible for the roadway reconstruction of 2-6 miles (raising roadway profile an average of 1.5-feet) along SR 907/ Alton Road, the design of 3 new pump stations in the City of Miami Beach and extensive private property harmonization.
SR 836/I-95 Interchange Improvements - Design Project Management
2014
-
Pres.
Client: MDX
Financial Project ID: 2516701-22-03
Project Description:
Scope of Work: The scope of work included developing conceptual plans and RFP, currently provided management and design support.
REI Responsibilities: Provided Coordination, management and plans review for the MDX portion of the SR 836/I-395/I-95 interchange. Responsibilities during the conceptual phase included the preparation of Design Exceptions and Variations, Typical Section Package, Request for Proposal (RFP) Documents, support in geometric design including horizontal and vertical geometry and preparation of conceptual plans, as well as coordination for Right-of-Way acquisition
Districtwide Drainage Design & Plans Review Contract - Drainage Consultants
2015
-
Pres.
Client: Florida Department of Transportation
Financial Project ID: FM 411433-2
Project Description: Drainage Design & Plans Review Contract Drainage Support Contract
Scope of Work: Design & Review Drainage Plans for
REI Responsibilities: Provided Plans, drainage reports, and bridge hydraulic report review,
Push-button project’s management & execution including preparation of drainage feasibility studies, construction plans and incidental roadway, TCP and PM&S components, and post-design services, Drainage design in-house support, FDOT D6 drainage design guidelines development to supplement statewide drainage criteria, Bridge Hydraulic Report Preparation for riverine and tidal conditions, Specialized drainage design services including pump station design and coastal engineering, Environmental Permitting Support, GIS Support, NPDES Permit Support and Other miscellaneous support including Surveying, Geotechnical, Underwater video inspection, sewer video inspection, Sub-surface utility engineering, Landscape, Lighting, Structural, electrical and mechanical design for pump station incidental work
FDOT D6 SR A1A Bridge over Haulover Cut – Bridge Deck Drainage Retrofit and Seawall Replacement Scour Analysis
Client: City of Miami Beach
Financial Project ID: -
Project Description: Ribbeck Engineering Inc. developed construction plans to upgrade bridge deck drainage system and conducted a 2-dimensional tidal hydraulic analysis using Mike-2D software to model tidal hydraulics and estimate scour for seawall replacement.
Scope of Work: Bridge Deck Drainage Retrofit and Seawall Replacement Scour Analysis
REI Responsibilities: Ribbeck Engineering, Inc. provided Structural, Mechanical and Civil Services.
SR 997/ Krome Avenue from SW 296th to SW 232nd Street – Reconstruction
2017
-
2019
Client: FDOT District 6
Financial Project ID: 427369-1
Project Description:
Scope of Work: Reconstruction/ signals for new signalized intersections
REI Responsibilities: Ribbeck Engineering, Inc. provided Structural, Mechanical and Civil Services. Ribbeck Engineering Inc. developed construction plans to upgrade the bridge deck drainage system and conducted a 2-dimensional tidal hydraulic analysis using Mike-2D software to model tidal hydraulics and estimate scour for seawall replacement.
Dolphin Park & Ride – Civil Site & Drainage Design
2017
-
2018
Client: Miami Dade County Expressway
Project Description: Civil Site & Drainage Design
Scope of Work: Preliminary Plans, Pavement Grading, Drainage, RFP Documentation, Permitting
REI Responsibilities: Ribbeck Engineering, Inc. was responsible for the Production of preliminary plans, pavement grading and drainage. Ribbeck handled the RFP Documentation and Permitting.